by Sander | Mar 27, 2021 | Projects, Uncategorized
Dow Terneuzen DCC has been requested by DOW Terneuzen to carry out a coating survey of a number of factories. The condition assessment of the coating systems was based on, among other things, the ISO 4628 standard. A good understanding of the condition of the coating...
by Sander | Mar 26, 2021 | Projects
Triton Knoll OWF DCC BV is involved in various offshore wind turbine projects including the Triton Knoll project. This project is located approximately 20 miles off coast of Lincolnshire England and has a potential capacity of 855 MW. The wind farm will provide...
by Sander | Mar 25, 2021 | Projects
Datacenter DCC provides a periodic check of the ambient air at a data center in Rotterdam. The generated information is used by the client to check the climate control logging system for correct operation. A mild climate is important in data centers to ensure that the...