by Sander | Oct 22, 2026 | Projects
For the Petersen Blasting Company in Harderwijk, we recently completed the inspections of a very special project. This involves the TSA metallization of a so-called “stress joint”. Due to the extreme length (about 30 meters), a special temporary facility...
by Sander | Oct 22, 2026 | Projects
Commissioned by APM, DCC BV is mapping the condition of the preservation at the various loading and unloading cranes of the APM terminal. Given that APM works day and night, this requires careful planning and coordination. The results of these inspections are the...
by Sander | Jun 29, 2026 | Projects
As of 22 September 2025, lot 2: ‘Technical Advice’ of the new Cooperation Framework Agreement for Engineering Services 2 (SROK ID 2) will come into effect. SROK stands for Cooperation Framework Agreement for Engineering Services. DCC BV was the only one to...
by Sander | Mar 30, 2021 | Projects
Team Terminal DCC is proud to execute the “management” and coating strategy for TEAM Terminal, a major crude oil storage terminal. The total protected surface area by coatings of the storage tanks is estimated to be more than 250,000 m2 of external coatings and more...
by Sander | Mar 29, 2021 | Projects
Hartel Tank Terminal (HES) DCC BV is involved in the new building of the HES Hartel Tank Terminal at the port of Rotterdam. A total of 54 tanks with a capacity of 1.3 million m3 will be built on the site of the new terminal. The tanks are protected against corrosion...
by Sander | Mar 28, 2021 | Projects
Akito Noshiro DCC BV is involved in various offshore wind turbine projects including the Akita Noshiro project. This project is located near the ports of Akita and Noshiro in Japan. It is a relatively small wind farm by European standards including 13 turbines for the...